Top 10 similar words or synonyms for completed

separated    0.989556

departed    0.989273

laid    0.988081

ordered    0.987693

что    0.987048

soon    0.986370

troops    0.986319

tigers    0.986004

slogan    0.985880

recommended    0.985711

Top 30 analogous words or synonyms for completed

Article Example
မီယာအာကာသစခန်း In its completed configuration, the space station consisted of seven different modules, each launched into orbit separately over a period of ten years by either [[Proton-K]] rockets or .
ရှိန်းကျိန့်မြို့ Longgan Railway Station is under construction and will be completed by 2013 to serve high-speed trains on the Hangzhou-Fuzhou-Shenzhen HSR route when it opens in 2013.
ဗွီ-၁ ဗုံးပျံ By 30 August, Fieseler had completed the first fuselage, and the first flight of the Fi 103 V7 took place on 10 December, when it was airdropped by a Fw 200.
ချန်အဲ ၁ လကမ္ဘာလေ့လာရေးယာဉ် According to the schedule, detailed design of the first program milestone was completed by September 2004. Research and development of a prototype probe and relevant testing of the probe were finished before the end of 2005. Design, manufacture, general assembly, test and ground experiments of the lunar orbiter were finished before December 2006.
ဗွီ-၂ ဒုံးပျံ Following Operation Crossbow bombing, initial plans for launching from the massive underground Watten and Wizernes bunkers or from fixed pads such as near the Chateau du Molay were dropped in favour of mobile launching. Eight main storage dumps were planned and four had been completed by July 1944 (the one at Mery-sur-Oise was begun in August 1943 and completed by February 1944). The missile could be launched practically anywhere, roads running through forests being a particular favourite. The system was so mobile and small that only one Meillerwagen was ever caught in action by Allied aircraft, during the Operation Bodenplatte attack on January 1, 1945 near Lochem by a USAAF 4th Fighter Group aircraft, although Raymond Baxter described flying over a site during a launch and his wingman firing at the missile without hitting it.
ဆလီနီအာကာသယာဉ် Kaguya completed the planned operation by the end of October 2008 and began extended operations planned to continue through March 2009. It would then be sent into a circular orbit, and finally to an elliptical one, with a controlled impact occurring by August 2009. Because of a degraded reaction wheel, the plan was changed so that on February 1, 2009, the orbit was lowered to ± ,
ရှိန်းကျိန့်မြို့ Futian Railway Station is under construction and will be completed by 2014. It is completely underground, located in the centre of its namesake Futian District. The central location means it will become the focal point for most high-speed train services on the Beijing-Guangzhou-Shenzhen-Hong Kong HSR route upon completion. Connection to West Kowloon Railway Station in Hong Kong will be made in 2015, allowing for 15 minute cross border train journeys.
ကျူးဘားဒုံးပျံအရေးအခင်း The United States considered attacking Cuba via air and sea, but decided on a military blockade instead, calling it a "quarantine" for legal and other reasons. The US announced that it would not permit offensive weapons to be delivered to Cuba, demanded that the Soviets dismantle the missile bases already under construction or completed, and return all offensive weapons to the USSR. The Kennedy administration held only a slim hope that the Kremlin would agree to their demands, and expected a military confrontation.
မီယာအာကာသစခန်း The initial rendezvous of the "Kvant"-1 module with "Mir" on 5 April 1987 was troubled by the failure of the onboard control system. After the failure of the second attempt to dock, the resident cosmonauts, [[Yuri Romanenko]] and [[Aleksandr Laveykin]], conducted an EVA to fix the problem. They found a trash bag which had been left in orbit after the departure of one of the previous cargo ships and was now located between the module and the station, which prevented the docking. After removing the bag docking could be completed on 12 April.
တိုင်ဖွန်း တိုင်ဖွန်းအမျိုးအစားရေငုပ်သင်္ဘော စုစုပေါင်း ၆ စီးတည်ဆောက်ခဲ့သည်။ Originally, the submarines were designated by hull numbers only. Names were later assigned to the four vessels retained by the Russian Navy, which were sponsored by either a city or company. The construction order for an additional vessel (hull number TK-210) was canceled and never completed. Only the first of these submarines to be constructed, the "Dmitriy Donskoy", is still in active service with the Russian Navy, serving as a test platform for the Bulava (SS-NX-32) missile which is currently under development. The "Arkhangelsk" (TK-17) and "Severstal" (TK-20) remain commissioned, though not currently active with the Russian fleet. All the R-39 missiles have been retired. The Typhoons are slated to be replaced by the Borei class starting in 2010-11.