Top 10 similar words or synonyms for overhead_wiring

overhead_wires    0.828594

overhead_electrification    0.775938

catenary    0.763638

overhead_catenary    0.732304

trackwork    0.712971

guideway    0.700918

concrete_sleepers    0.694858

kv_ac_overhead    0.694268

kv_hz    0.665878

semaphore_signals    0.663879

Top 30 analogous words or synonyms for overhead_wiring

Article Example
Intermodal freight transport Since electrification generally predated double-stacking, the overhead wiring was too low to accommodate it. However, India is building some freight-only corridors with the overhead wiring at above rail, which is high enough.
Tait (train) For the purposes of inspection of overhead wiring, carriage 3CM was constructed to a modified design with an overhead compartment for inspectors to watch the way that the overhead wiring reacted to contact with pantographs.
Bournemouth Corporation Tramways Until May 1911, part of the system was equipped with conduit supply to avoid unsightly overhead wiring on the central section of the tramway. From May 1911, overhead wiring was introduced.
Railways in Melbourne Power is supplied by catenary-style overhead wiring at 1500 volts DC.
Nuremberg–Augsburg railway The overhead wiring of the line, mostly dating from 1935, was renewed between 2004 and 2006.
APM Siding The rail was removed in 2003–2004, and ended up at the Yarra Valley Tourist Railway, with all overhead wiring on the siding gone by this time. A dwarf signal and overhead wiring stanchions remain in the paper mill grounds themselves. The paper mill was closed in 2012.
Ipswich engine shed During the early 1980s the site was used as the electrification depot for the extension of the overhead wiring from Colchester to Harwich. Ipswich (May 1985) and Norwich.
Trolleybuses in Trieste Overhead wiring was dismantled between 1975 and 1982. Some vehicles were scrapped, while others were sold to the Salerno transportation authority (A.T.A.C.S.).
Double-stack rail transport Since electrification generally predated double stacking in Europe and New Zealand, the overhead catenary is too low to accommodate it. Many bridges and tunnels are too low for double-stacking, by far too expensive to rebuild for this reason. However, India is building some freight-only corridors with the overhead wiring at above rail, which is high enough. In India (passenger), Pakistan (passenger), Finland, Russia, and Kazakhstan, 25 kV AC overhead wiring is at above rail.
Amsterdam Metro Originally, the entire trajectory of the Amstelveen Line from Spaklerweg, where it connects with the East Line, to Amstelveen was to be powered via overhead wiring. Eventually, it was decided to use a third rail between Spaklerweg and Zuid station in order to be able to increase metro service on this section of the line during exhibitions at the RAI convention centre, and overhead wiring on the southern section into Amstelveen.